Project Description: <fill in project name, location, dates, and “application” - keywords from attached list and short / concise bulleted narrative>Project Owner: <fill in organization’s name and address, and contact’s name, affiliation/position, phone, email>Scope: <keywords from attached list and short / concise bulleted narrative of study scope / objectives, including purpose, scale, schedule, budget and level of accuracy / defensibility needed>Approach: <keywords from attached list and short / concise numbered narrative and/or graphics, e.g., flow chart, of steps / activities> o performance measures considered (see attached list) o decision method used (if any) o level of detail adopted o input assessment methods used o performance and probabilistic modeling methods usedKey Results: <short /concise bulleted narrative and, if desired, graphics with respect to scope> o performance uncertainties / sensitivities o decisions madeCost and Value of Results: <short / concise bulleted narrative> o duration (from start to substantially complete, i.e., results) and effort (including owner’s, in then current US dollars) involved o value from owner’s perspectiveLessons Learned: <short / concise bulleted narrative of problems that arose and how to solve them in the future, e.g., unreasonable expectations>References: <list available reports, papers, etc.>Disclaimer: <standard>Reviewer: <fill in reviewer’s name, affiliation, phone, email>
Keywords / Categories • Type of project / application o Market (choose one, or more if applicable)
ƒ transportation
ƒ development
ƒ water resources
ƒ mining
ƒ waste disposal and environmental remediation
ƒ other <specify> o Component (choose one, or more if applicable)
ƒ foundations / fill
ƒ slopes / embankments / excavations / retaining structures
ƒ dams / dikes / reservoirs
ƒ tunnels / underground construction
ƒ pipelines
ƒ industrial systems
ƒ remediation
PRELIMINARY DRAFT June 2004 3 TC32 Case Study Data Base Proposal
ƒ other <specify> o Scale (choose one)
ƒ small (e.g., individual facility)
ƒ moderate
ƒ large (e.g., regional) • Performance measures (choose all that apply) o cost (time consideration, responsibility) o schedule o safety impacts o environmental impacts o social impacts o operational impacts o other <specify> • Accuracy / defensibility goals (choose one): o low (e.g., for internal scoping study) o moderate o high (e.g., for public / regulatory review of major project) • Scope and Approach (choose all that apply, based on attached chart) o Decision Analysis
ƒ among alternatives or optimization
ƒ based on full performance assessment or risks only (“risk management”) o Decision Criteria Development o Performance Assessment
ƒ Full Uncertainty Analysis
ƒ Risk Assessment • Hazard Assessment • Vulnerability Assessment Note: for any aspect of performance assessment, specify:
ƒ qualitative or quantitative
ƒ empirically-based or theoretically-based
ƒ static or dynamic (time consideration)
ƒ deterministic or probabilistic
ƒ objective or subjective or hybrid input assessments
ƒ analytical or analytical approximations or Monte Carlo simulation probability model